The remains of the front wall (demolished by tractor) has been laid as hardcore then blinded with sand and dpm down, shuttering all ready.
Stripped off the outer skin already up and added a dormer window and doorway.
Mixed with a baby mixer this time, a lot more work than pre mixed, but easy enough.
Added a slopped step for the doorway also.
The pottery is taking shape quickly now, should get the outer skin on by the weekend and plan to do the outer timber wall over half term!!!
No comments:
Post a Comment